Plan and actual are within budget, 7,600 € in reserve.
Project progress 58%Spot budget overruns before they happen
99BRICKS combines time tracking and project controlling. As soon as the plan or booked time puts a budget at risk, the traffic light shows that action is needed. That leaves you room to decide.
No payment details needed for the trial. Afterwards from €1.99 per user and month plus VAT.
Why budget overruns are almost always noticed too late
In most projects the overrun is certain long before anyone sees it.
Hours arrive at the end of the month
Hours are entered in bulk after the fact. By the time they are analysed, the budget has long been spent.
Budget, plan and actual live in three lists
The quote is in the ERP, the plan in Excel, the hours in the time tracker. Nobody compares them every week.
The view only looks back
A target/actual comparison shows what has already happened. It does not tell you whether the work still planned fits the budget.
The later the deviation becomes visible, the fewer options remain. Cutting scope, renegotiating or replanning only works while there is still budget left.
Target, plan and actual: the need to act at a glance
Every project and every pot shows the same three figures side by side. A traffic light tells you at once where you need to act.
The plan is 12,000 € over budget.
Project progress 50%The budget is already exceeded by 8,400 €.
Project progress 85%1 of 3 projects needs your attention, and you can see it without reading a single number.
The dashed line is the budget limit. Anything beyond it turns yellow (planned) or red (booked). The same traffic light appears in the application on every project and every budget pot.
How you see the need to act weeks earlier
- A warning at the planning stageThe traffic light turns yellow as soon as planned hours and costs exceed the budget. That is before the first of those hours is booked.
- Forecast at project endActuals to date plus the plan for the coming months give the forecast. You see where the project will end up if nothing changes.
- Every budget pot on its ownBudgets are monitored per activity and cost type. An overdrawn pot stands out even when the project as a whole still looks fine.
- Weekly report from the project leadBudget, schedule and quality as traffic lights, with reasons and measures. Controlling sees the system figures and the assessment side by side.
One platform, six building blocks
Everything project teams need for time and budgets
Book in seconds
Your employees see exactly the active projects they are assigned to. Click the day, enter hours and a description, done. Clock times don't matter.
Budgets in pots
The project lead divides the project budget into pots: individual activities, external services, material costs, other invoices.
Only book what is assigned
In budgeted projects, each person books only to the activities and to the extent assigned to them. You decide how far the allowance may be exceeded.
Currency or hours
Each project role has a day rate with a validity period. This lets every report show euros, US dollars or hours at the touch of a button.
Spot off-track projects early
Budgets may be exceeded. But project controlling shows immediately which project and which pot is getting out of hand and what the forecast looks like.
Timesheet as Excel
Date, description, employee and effort in hours, sorted chronologically and for any period: ready for your customer.
Open projects
For internal topics or time-and-materials work: projects with an open budget to which the team books unlimited hours.
Overtime and productivity
Every month, each employee sees target and actual, overtime, compensation and their productive hours per half-year, optionally with a productivity bonus.
Sign-in through your company
Sign your team in via single sign-on: with Google, Microsoft Entra ID or any SAML 2.0 provider. Plus two-factor authentication and an audit log.
No installation required
Right in the browser, at your own address, for example your-company.99bricks.de. In 23 languages, in your colours and with your logo.
How to get started
- Create WorkspaceSet up in a minute, 14 days free, with sample data if you wish.
- Set up projects and teamProject roles with day rates, projects with budget, pots and planning.
- Book and controlThe team records time, you see target, plan and actual and export the timesheet.
Frequently asked questions
How do I detect a project budget overrun early?
By not only comparing actuals with the budget but also including the work still planned. 99BRICKS adds actuals to date and the plan for the coming months into a forecast and flags it as soon as it exceeds the budget.
What is the difference between target, plan and actual?
The target is the budget of the project and its pots. The plan is the hours and costs the team schedules month by month. The actual is the booked time, valued at the day rate, and the booked project costs.
Why is a target/actual comparison not enough?
It only shows an overrun once it has happened. If the plan is above the budget or the forecast runs beyond it, the need to act is visible weeks earlier. Then you can still replan, prioritise or renegotiate.
How current are the figures in project controlling?
Every booked hour and every booked invoice immediately affects actuals, forecast and traffic light. Because the team books its time daily on project and activity, you do not have to wait for month-end closing.
Who is 99BRICKS for?
For companies that run projects with a budget: agencies, consultancies, IT service providers, engineering and planning offices, and internal project organisations. It pays off from the first project in which several people book time against a budget.
Do I need a separate time tracking tool?
No. Time tracking is part of 99BRICKS. Employees book their working time directly on their assigned activities; actual costs, forecast and timesheet follow from that with no further steps.